Decoration process II hydropower transformation

2022-07-22
  • Detail

There is no regret medicine for hydropower transformation. Once the wall and ceiling are sealed, it is difficult to add sockets. Therefore, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Arrange the use of each space. Before the water and electricity transformation, the cabinet designer should come to the door for the first measurement to help you determine the transformation plan of power supply and waterway. For the water heater, you'd better send someone to design the position of the power supply and the water supply and drainage interface according to the model you determine. To mention

there is no regret in hydropower transformation. Once the wall and ceiling are sealed, it is difficult to add sockets. Therefore, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Arrange the use of each space

before the water and electricity transformation, the cabinet designer should come to the door for the first measurement to help you determine the transformation plan of power supply and waterway. For the water heater, you'd better send someone to design the position of the power supply and the water supply and drainage interface according to the model you determine. It should be reminded that on the wall under the basin, it is best to leave a power socket for the convenience of installing kitchen treasures. The air conditioning hole and power supply should be placed on the wall at the head of the bed as far as possible to avoid the air conditioning blowing directly at people in the future. Strong electricity and weak points should be kept at a distance of 20 cm. For example, a distance of 20 cm should be left between the socket and the network cable

杭州结石医院

昆明甲状腺医院

贵阳癫痫医院

Copyright © 2011 JIN SHI